An integrated range of Solutions and Services in Eight Business Areas.
Real Contractors Designs, Builds and Maintains Projects in Rwanda and the East African region.
Located at Rusororo, this project consisted of a conference hall with multiple buildings and high-end finishes. The project was completed in 2017
This project is located in Nyagatare District and consisted of the construction of a star hotel with and high-end finishes. The project was completed in November 2017.
Civil works, MEP works and External Works
Located in Kigali, Prime Economic Zone, this project consisted of the construction of 5 big industries totaling a built-up area of 37,980 Square Meters. This project was completed in February 2018
The project is located in Nyagatare District and was undertaken as a joint venture with UNION STONE
The project, located in Kigali, Prime Economic Zone, consisted of the construction and renovation of the internationally renowned Africa Improved Food Factory with the aim of upgrading the facility an international standard. This project was completed in November 2016
The project, located in Muhanga District, is a 5 Storey building with a basement that accommodates the parking Lot. The project commenced in October 2010
Real Contractors Ltd has been awarded the contract for building the National Bank of Rwanda branches in Rwamagana and Rusizi. The project was completed in 2014
Real contractors Ltd was contracted by college of business and Economics to construct modern lecture rooms for the institution. The complex consists of four floors
The Association of Artisans of Rwanda (ADARWA) contracted Real Contractors Ltd to build a big complex which serves as headquarters for artisans and carpenters in Rwanda
Rwanda Coffee Farmers Association (RFCC) has set up a coffee roasting and packaging factory in Rwanda. The building is located in Gikondo, Kigali. Real Contractors Ltd was contracted to build the factory, a process that was completed in six months
Located at Nyarutarama, Kigali, this project consisted of the construction of primary school as well as dormitories of an international standard
The Gisozi apartments project is a 7,281square meters residential development located in Gisozi sector Gasabo District in Kigali city. The Gisozi apartments complex comprises of 5 blocks, containing 32 units of 3 and 4-bedroom apartments
The project comprises of 3 blocks of hostels located in Butare next to University of Rwanda. It is supposed to cater for shortage of accommodation facilities for students in UR. Each block has a total of 2,981 square meters with 6 levels, one of which is a basement
The project is located in Nyagatare next to Mutara Polytechnic. It is supposed to cater for acute shortage of accommodation facilities for students in the polytechnic and adjacent colleges. The hostel comprises of one block with a total plinth area of 2,642 square meters
Kabuga Hillside Estate Phase I comprises 79 maisionettes. Each maisionette has a total plinth area of 187 square meters and their domestic servant’s quarter has a plinth area of 20 square meters. Each mansionette has a lounge cum dining room, kitchen, store, guest room en-suite, cloak room, 3 bedrooms with master bedroom ensuite and a shared bathroom
The Gacuriro Maisonettes comprises four semi-detached two storied blocks. Each semi-detached block has two units each measuring 178 square meters –a block measures 356 square meters. Each unit comprises a lounge cum dining room, kitchen, store, guest room en-suite, 3 bedrooms upstairs with a master bedroom en-suite and a servant’s quarter.
To be Green Certified by mid-2020.
This project consists of the construction of 3 warehouses for the refinery of minerals. The total built-up area is 2,000 Square meters with a concrete frame
This a design and build project consisting of the construction of an international standards pharmaceutical factory to be one of a kind in Rwanda
Consisting of a 7 level building, this structure shall host the Gasabo district offices once completed with high ends fittings and finishes
The project comprises of 3 blocks of hostels located in Kigali City. It is supposed to cater for shortage of accommodation facilities for students in UR by providing over 200 roomsThe project comprises of 3 blocks of hostels located in Kigali City. It is supposed to cater for shortage of accommodation facilities for students in UR by providing over 200 rooms
Located along the river side of River Akagera in Kanzenze, this project consists of the construction of a water treatment plant for a daily production of 40,000 cubic meters of portable water.
The project is still under construction and to be completed by end March 2020.
Located along the river side of River Akagera in Kanzenze, this project consists of the construction of a water treatment plant for a daily production of 40,000 cubic meters of portable water.
The project is still under construction and to be completed by end March 2020.
Located along the river side of River Akagera in Kanzenze, this project consists of the construction of a water treatment plant for a daily production of 40,000 cubic meters of portable water.
The project is still under construction and to be completed by end March 2020.
Located at Gisozi, Gasabo district, Kigali. This project consists of the construction of a Multipurpose building (Multipurpose Hall and Offices). It consists of a basement and ground plus two stories The project is still under construction and to be completed by end January 2022.
Real Contractors Ltd is one of the leading construction companies in Rwanda and the East African region. Our experience is widely diversified and covers a wide spectrum of the construction industry and its ancillary services including: commercial buildings, airports, housing, educational facilities, sports facilities, water & sewage projects, wastewater treatment plants, power stations and transmission lines, electromechanical engineering projects, production and workshop, maintenance services, built environment consultancy and property management services.
Real Contractors Ltd was formed after the merger of Real Contractors SARL and Bond Trading SARL in January 2011. Prior to the merger, Real Contractors SARL was in real estate development and construction business while bond trading was in property management, engineering services and investments. In 2017, Real Contractors Ltd expanded its portfolio after the merger with CVLD Ltd, a sister company dealing in built environment consultancy, real estate development and property management.
The company is 100% owned by Crystal Ventures Ltd. Since its inception, Real Contractors Ltd has grown from strength to strength and has been a proud winner of the BID International.
Our focus is driven by our desire to achieve and exceed intended goals
"To deliver world-class projects for first-class development "
"To build the future with innovative and sustainable solutions"
"Green, Innovative, Accountable, Results-Driven, Integrity "
Please feel free to drop us a line.
KK 705 St, Kigali
info@real.rw
+250 788306817